I finished 4 last quarter! I am super excited about that, usually I have been averaging one or zero finishes per quarter. I always sew a little on a several, but I don't get a lot of finishes that way.
I am sticking with 14 again this quarter, but going to try something new. Usually I list the same older UFOs over and over hoping I will work on them in between current projects and never list any of my current projects. This time I am going to list projects I have already started that I know I will actually be working on this quarter. I have kept some oldies on there and even brought back some holiday themed oldies in case I am super ambitious and want to tackle those older Holiday UFOs. This should give me way more finishes and will actually show that I really am sewing stuff each quarter. :)
End of Quarter Update: I finished four and made progress on several others.
Updated comments are on the right..
I am sticking with 14 again this quarter, but going to try something new. Usually I list the same older UFOs over and over hoping I will work on them in between current projects and never list any of my current projects. This time I am going to list projects I have already started that I know I will actually be working on this quarter. I have kept some oldies on there and even brought back some holiday themed oldies in case I am super ambitious and want to tackle those older Holiday UFOs. This should give me way more finishes and will actually show that I really am sewing stuff each quarter. :)
End of Quarter Update: I finished four and made progress on several others.
Updated comments are on the right..
and quilt it. Status Update: Top is almost finished, All rows are sewn together, I just need to hand stitch down the top and bottom hexies that touch the panel. | |
Almost all the blocks are done.
Top should go together pretty quick, then just need to quilt it. I am hoping to have this one on the couch by Thanksgiving! Status Update: All rows are sewn together. Inner Border is cut and ready to sew on. | |
after being off for several quarters. It just needs Quilting. Status Update: Didn't even pull this one out of its box. | |
Going to fiddle with this one.
Last time I played with it I came up with a better way to sew the sections together. Status Update: I opened the box on this one and thought about working on it, but that was it. | |
longest time. I is a table topper, so it should be quick to sew up. Status Update: The top is sewn, just need to add applique ornaments and quilt it. | |
shop at the beach. I am excited to make this one. Got my fabrics all picked out ready for cutting. Status Update: I looked at this one a lot. | |
left out of the kit, just need to cut it and then start sewing the top together. Status Update: Nothing happened on this project this quarter. | |
to secure with green thread, then this one will be ready for quilting. Status Update: Made sure I had some green thread. I do. | |
| |
This will be the second Christmas quilt
I am planning to make this year. I am finally going to break into these Flurry charm packs by Moda. They have been on the shelf for years and I have decided on the perfect pattern for them: Chain Link by Amy Smart. I even have some nice Flurry Yardage to go with them. Status Update: Decided on the layout of the charm squares. Took a photo to remember. |
|
my mom in 2010. When I made hers I cut out enough to make one for myself as well. I even have the nine patches already sewn together. I want to have this one on the table for Thanksgiving! Status Update: This was not on the table in time for Thanksgiving... Maybe in 2020. |
=^..^=
No comments:
Post a Comment